FORE & AFT MARINE
![]() |
SORRY THIS ITEM HAS BEEN DISCONTINUED AND IS NO LONGER AVAILABLE. PLEASE CHECK OUT OUR OTHER SELECTIONS |
398-1500(LIST $76.50)
|
Installation of Switch and Wire Assemblies |
||
Step C: Mounting Switch
Assembly to Dash.
1. Locate desired and easy access position for
switch.
2. Using a 2 1/2" hole saw, drill the holes
for the switch or cut with a
jig saw.
3. Using the switch bezel as a template, mark
the four corner mounting
screws. See Figure 4.
4. The toggle switch type assembly uses a
mounting gasket.
5. Install a wire harness, connect the five pin
male-female plug at
energy pack, fish wires
to helm.
6.Cut wire to desired length at the switch and
install ring terminals.
7. Mount switch with four #6 stainless steel
screws after switch
connections are made
(use 3/32"bit).
8.Connect color coded wires to color coded
screws of switch.
(Note: color coding on switch
body.) See Figure 5.
9. Connect hot lead to battery.
10. Connect ground lead from energy pack to
battery ground.
11. Bleeding system-work tabs full down and up
two to three times.
|
![]() |
SORRY THIS ITEM HAS BEEN DISCONTINUED AND IS NO LONGER AVAILABLE. PLEASE CHECK OUT OUR OTHER SELECTIONS |
Limited lifetime warranty